Independent news, history, and community perspective on Thesen Islands and Knysna. Free from HOA and Development Company oversight.
Thursday, January 29, 2009
This is my first letter to the Executive Mayor:
By hand
11 December 2008
Eleanore Bouw-Spies
Executive Mayor - Knysna
Dear Eleanore,
Re: Making Space for people waiting for lifts at the start of the Lagoon Road
I am writing to you as we are familiar faces to each other through the years of the Thesen Islands redevelopment and as someone who has the interests of the people of Knysna at heart.
The side of the road west of the intersection of Waterfront Drive and the Lagoon Road has been used for years for people looking for lifts. A few years ago some bright spark decided that no one should be able to get lifts there and put in the low wooden fence stretching some distance along the road to stop drivers from pulling off the road. This resulted in:
1. Vehicles still stopping in the same spot but now being unable to pull fully off the road, created a dangerous situation for all road users and
2. The lift seekers moving further down the road to beyond the fence.
(By the way, you would have noticed that the same situation in Sedgefield.)
This decision to put the low fence in place was in complete indifference to the realities of the South African people. It hardly needs pointing out – except to this decision maker – that the majority in South Africa do not have a car and are dependent on taxi's and others to transport them. That is why they are on the side of the road.
Therefore provision must be made for them.
Now that the Lagoon Road is being upgraded, I ask that you, as executive mayor of our town, ensure that there is an area alongside the road where vehicles can pull off safely and pick up and drop off passengers.
Failure to provide for the lift seekers and givers in this upgrading will not make them go away. The cars, taxis and trucks will continue to stop in the road, endangering everyone.
Yours sincerely,
Ken Rutherford
She responded, or rather Christopher Bezuidenhout responded on her behalf, saying my letter will be sent to Johnny Douglas. He responded by saying "I will request my Director: Technical Services, Neale Perring to table it at the next Technical Steering Committee Meeting."
This is my response of 22 January 2009 to Mr Douglas:
Dear Mr Douglas,
Someone within the Municipality needs to champion the needs of the poorest people of our town on this issue!
Based on the non committal tone of the replies, my concern is that neither you, nor the Executive Mayor feel the need to "push" the matter, namely the pressing need for for place for vehicles to pull over to pick up people at the start of the Lagoon Road.
The Executive Mayor passes my letter on to you, you pass it on to Mr Perring who then tables it at a meeting of the Technical Steering Committee which is a group of engineers whose primary interest lies in road construction. Who well could be the very people responsible for the current low fence designed to stop drivers from stopping to pick up lift seekers!
Perhaps I am wrong and the plans do include a stopping area. Well, then congratulations to the engineers!
But if not, I think that for anything to happen this matter needs to be motivated by either you or the Executive Mayor, and preferably both. If you agree it is important, then I ask that you put your weight behind it. If not, well, let me know why!
Will you please keep me informed as to what the outcome is of this matter being tabled at the Technical Steering Committee Meeting?
Warm regards, Ken Rutherford
Communal Jetty Sinking? This communal jetty on Leeward Island looks like it is sinking. As the pictures show it is listing towards the large boat in the hoist. Why would the the HOA gave permission for a hoist to be installed on a communal jetty? It is looking for trouble and, judging from the pictures, it is finding it.
Thursday, January 22, 2009
This email to the HOA is self explanatory: The size of the boats can and should be regulated. The last paragraph sums up my concern.
From: Ken Rutherford
Sent: 27 July 2007 11:48 AM
To: TIHOA (tihoa@tihoa.co.za)
Cc: Louwtjie Burger
Subject: Boat Sizes – Attn: Mr Smit
Dear Mr. Smit,
To confirm our conversation regarding boats longer than 5.5m or 2.3m wide berthed at communal jetties:
This is from the order form the buyer of a berth at a communal jetty signs:
►The berth finger is 4.5 metres long and can accommodate a maximum boat size of 5.5 metres long and 2.3 metres wide. The boat should not draw more than 0.5m. Due to design constraints, no boat may exceed the maximum allowed size or draft.
This is from Annexure A of the Berth Agreement:
10. MAXIMUM BOAT SIZE :
11. LENGTH : ……….…………………………… (5.5m is inserted here)
WIDTH : ………………...…………………… (2.3m is inserted here)
Exception: Berths 14-25 to 14-36 inclusive can accommodate a maximum boat size of 7.7m long by 3.0m wide. These berths were included in the purchase price of designated erfs sold by TIDC.
This is from the Berth Agreement:
8. MAINTENANCE AND REPAIRS
8.1 The maintenance and repair of the BERTH and the JETTY will be undertaken by a contractor appointed by HOA and by no other person.
8.2 The BERTH HOLDER will, upon request made by HOA, pay to HOA the BERTH HOLDER's proportionate share of the cost of all such maintenance and repairs together with the HOA's reasonable administrative cost in connection therewith. The BERTH HOLDER's proportionate share is the total of all such costs divided by the number of BERTHS comprising the JETTY.
8.3 The BERTH HOLDER undertakes to notify HOA of any defects in the JETTY.
8.4 HOA shall in its absolute discretion be entitled to undertake maintenance and repair of the JETTY as it deems necessary.
8.5 In the event of a dispute as to the amount of the BERTH HOLDER's "proportionate share" or any amount payable in terms of the aforegoing, the dispute shall be referred by HOA to an independent auditor for summary decision and such decision shall be final and binding on HOA and the BERTH HOLDER who will, in equal shares, bear the costs incurred with the said auditor in implementing the provisions of this sub-clause.
The maximum boat sizes were implemented because the communal berths are designed to accommodate boats no bigger than specified. Boats larger than the maximum put added strain of the jetties and potentially can cause damage. It is unreasonable to expect berth holders to be on the line for repair expenses if the HOA does not enforce the maximum boat size. (Colour & emphasis added for blog).
Regards,
Ken Rutherford
No virus found in this outgoing message.
Checked by AVG Free Edition.
Version: 7.5.476 / Virus Database: 269.10.22/921 - Release Date: 2007/07/26 11:16 PM
Sunday, April 15, 2007
http://www.iol.co.za/index.php?art_id=vn20050314064403551C445420&set_id=1&click_id=15&sf=
Sunday, March 11, 2007
I refer to the quote from Kobus Visser of Element Consulting Engineers (Knysna-Plett Herald, 22 February 2006): “However, due to the flooding in August 2006 and the associated damage to Kaaimans Pass and the rest of the route…. (completion) is now only planned for June 2007”.
No one I have spoken to can recall any damage of consequence to the road from the Kaaimans to Knysna from this flood, aside from some minor damage on the Knysna Lagoon section.
So to boil it down, the excuse is “Everyone was working on the Kaaimans Pass repair so we had no other people to do the rest of the road”. Well then, how about hiring more people? Or passing on the opportunity of the additional work on the Kaaimans Pass and finishing on time what you had contracted to do?
Any regular traveller between Knysna & George knows only too well, that disorganisation, time wasting and the redoing of sections are the major reasons the job was not finished on time.
All of this would be merely extra inconvenience if the poor execution of the job had not come at such a human cost. It certainly appears that the inadequate temporary signage and/or marking of the road during the repair work could have been a major cause of many of the accidents that killed and maimed of a number of our Knysna neighbours and friends, as well as others. To be fair, the temporary signage and road marking has improved, but it should have been better from the start.
Not to discount the added probable factor in the accident of poor driving and/or speeding. (Quick road safety quiz: Do you know what a solid white line means? What side of the white line should you drive? What does a sign saying “60” mean? Note to contractor: Please remove the sign when the particular road work has finished. Nothing breeds contempt for speed limits more than ridiculously low limits.)
Let’s all drive smarter when the White Bridge to Knysna section is progress. Let’s see if we can have no one killed or maimed. And can our elected leaders and municipal employees be proactive in looking after the interests of Knysna residents by seeing that the work is done in the safest possible manner?
Thursday, March 01, 2007
The secret is to find what grows.... Wind is a problem in my garden. In the more exposed parts, growth is definitely slower.
Has anyone tested their soil? Ian Horne, who planted all the common areas, says the soil is very salty. Recommends gypsum. I can't find much information on it on the web. I am going to see if I can get a soil test kit here in Knysna
Saturday, February 24, 2007
Is it to much to ask that the architects don't redesign the same house over and over again? You can walk down a street and often tell who designed each house!
Any suggestions for the best looking house on Thesen Islands?
Monday, November 20, 2006
First published June 8, 2002

After three visits of a few months each, Don Austin, a respected former head professor of Landscape Design & Urban Architecture at Texas A&M University received his doctorate) recently completed the layout design of the 11 ha Park and Bird Reserve. It promises to be a natural wonderland.

Many of these slightly elevated stands (3.4m above MSL) have lovely long views over the Parkland or Bird Reserve towards The Heads and Leisure Island. The group of 8 smaller stands north of the Clubhouse will be released when the designs for the homes are completed. These stands will be sold with concept plans for "Harbour Houses".
You may have heard or read about the big storms along the Cape coast in late May 2002 and the damage caused. Here in the Knysna area, the damage was limited to the caravan park at Buffelsbaai and flooding on Leisure Island and parts of lower Knysna town.
According to some old locals, this was the highest tide in 50 years. It was caused by a combination of events happening at the same time - spring tide, a cold front and strong westerly winds. On Leisure Island, to quote the Knysna Plett Herald, "streets were flooded and in some cases sea water washed into low level garages and homes. Small boats moored in the area were stranded on pavements."
No problems were experienced on Thesen Islands in part due to the raising of the Islands by an average of 1 metre. The nine years of planning that was put into Thesen Islands translates into practical benefits for all Thesen Islanders!
The new bridge, which will be similar in design to the smaller arched bridges linking the Islands, will allow boats to pass underneath it. A section of the causeway will be removed and replaced with a bridge that will be approximately 40 metres in length, with a 25 metre water flow opening.
At the end of May 2002, construction started on the Causeway Bridge. The completion date is November 2002.

New Parkland Stands Release and Progress Update
Phase 2 ReleaseIn early March, the first of the Phase 2 stands - the 20 stands on the southern shores of Khoi and Leeward Islands - were released. Several have already been sold!
Soon to be released are the first of the Parkland stands. These slightly elevated stands have lovely long views over the Parkland or Bird Reserve towards The Heads and Leisure Island.
Looking South to the bridge linking Plantation Island and Hammock Island.

Gazebos on each Island are a welcomeplace for walkers to rest and enjoy the views

The plans for the 11 ha Parkland and Bird Reserve include freshwater ponds and reedland bird habitats with walking trails, boardwalks and elevated bird hides. The lucky few who act quickly will have a unique spot on Thesen Islands. For the latest details, click on Contact Info and ask for more information and prices.
Construction Update The 28th of February was an exciting day. The Phase 2 waterway between Leeward and Plantation Islands was opened at low tide by removing the plug between L38 and P47. By early evening, with the spring tide coming in, the waterway was spectacularly full. Another high point at Thesen Islands!
The construction of Phase 2, which includes part of the Parkland, is well underway. It is expected that this phase will be completed by the end of August 2002.
Home Building Update Four homes have been completed with about another 16 under construction. Judging from the planning activity, it is estimated that up to 50 homes could be under construction or completed by the end of the year.
Living on the beach at the Cove on Leeward Island

Security Update
The Gate House is now manned 24 hours a day. The TIHOA Trustees have awarded the security contract to Khulani Fidelity Services Group. Entry to the Islands is to Thesen Islanders and their guests only. Each home will be electronically linked to the Gate House. Prospective owners who want to see the completed Islands can contact the Sales Centre to schedule an appointment.
Island Flags
Each Island has its own flag design. These designs have been taken from the signal flags of the Knysna Steamship Co, which was operated by Thesen & Co. These flags were flown at the Thesen Jetty to announce to the town the progress of their various ships along the coast. For example, the Crab Claw Island flag would signal "Steamer is expected to arrive at Knysna today". Thesen Islanders are entitled to use their particular Island’s flag design on their stationery, at their home or on their boats.
Late afternoon view of the waterways
Sunday, November 19, 2006
The "Islander News" was started as a way of keeping the buyers informed of what was happening on the Island. Having signed a sale agreement and paid a 20% deposit, they were naturally keen to be kept in touch with how their "investment" was progressing. Many of them signed up in the period from late '98 - when sales started - and mid 2000 when the redevelopment of the Island started.
As the sales manager at the Thesen Islands Sales Centre, I was responsible for taking the photos (in the early stages) and doing the writing. Other photographs, including the aerial ones) were taken by Ian Fleming
11 Islands Completed
The creation of Thesen Islands is well underway with 11 Islands completed and 5 Islands partially completed.
Owners in the first phase (1A) took transfer of their stands in July 2001. At last count 13 homes were under construction with four homes looking like they will be completed in time for the festive season.
Phase 1B was competed in November, with owners taking transfer in late November and early December 2001.
Here are some recent pictures of the Islands...






Here comes the water... and the Premier of the Western Cape!
Premier of the Western Cape, Gerald Morkel, Cabinet Ministers and senior officials , visited Thesen Islands on Monday 14th May 2001, reported the Knysna-Plett Herald.
After a presentation of the re-development of Thesen Islands at the Sales Centre by Chris Mulder, they were taken for a tour of the work in progress. They then had lunch at the Knysna Oyster Company on the Island.

A view of the waterways looking towards the Heads.
The visit coincided with the opening of the Phase 1A waterways to the lagoon. This long awaited event took place at low tide on Monday when the earthen wall separating the waterways from the lagoon was carefully removed. To slow down the flow of the water into the waterways, water was pumped into the waterways to equalize the level of the lagoon and waterways, prior to the removing of the wall. The incoming tide then slowly filled the waterways for the first time, witnessed by an excited group of workers.

A view of the waterways looking towards Knysna.
The whole process took place under the watchful eye of Pieter Badenhorst, the Environmental Control Officer, who is tasked with ensuring that the redevelopment takes place within the guidelines laid down by the Department of Environmental Affairs.
The tidal flow around the islands promises excellent natural circulation. The CSIR (Council for Scientific and Industrial Research) have used a state of the art modelling system developed by The Danish Hydraulic Institute to assist with the design and layout of the waterways.
With a team of 240 local workers, the construction of the waterways proceeded quickly. 70 metres of the natural stone packed gabions waterway sides were completed daily. The top edges of the gabions, above the inter-tidal zone, are planted with indigenous groundcovers. The sides will be planted with inter-tidal plants from the onsite nursery. The bottom of the waterway is the existing fine white sand. The average water depth of the waterways is 1.6 metres. Waterfront properties have a private timber jetties, with stairs down to the water.

A view from a jetty on Plantation Island towards Jubilee Island. A typical jetty is on the left.
The first phase of the re-development, now 80% sold out, is scheduled for transfer in mid June. The second phase, already 50% sold out, will be complete in November 2001. To date, 177 stands have been sold.
A number of owners are planning to start building their homes immediately. Many of them will be spending Christmas, 2001, on Thesen Islands.
Thursday, November 09, 2006
First published in November 2000
Deputy Minister praises Thesen Islands - Very Best SA Research
On Monday a party was held on Thesen Islands to celebrate the start of construction of the re-development of Thesen Island into a marina with 19 islands. The Deputy Minister of Environmental Affairs and Tourism, Minister Ms. R.T.Mabudahfhasi opened the event after welcoming addresses by Chris Nissen, Community leader and Arcus Gibb director and Knysna Mayor, Alan Kock.
Graham Power, on behalf of the Development Company, gave a brief history of the planning of the project, which was begun in 1990, and thanked all those who had been supportive, particularly the Knysna Town Council.
In her well received, passionate address, Deputy Minister Mabudahfhasi " We stand today on the threshold of a new era in the history of Knysna. An era that will be characterised by development that is sustainable, that takes into account, very seriously, environmental concerns and the need for the future generations to also sustain themselves."
The wide waterways of Thesen Islands give a feeling of openness and space. The natural stone sides are planted with indigenous ground cover and intertidal plants. This photo was taken from Plantation Island looking North up the waterway, with Jubilee Island on the right.
She expressed her appreciation to Thesen & Co for the "for the most responsible manner in which they conducted, supported and financed the environmental research, which probably represents the most comprehensive, professional and detailed Environmental Impact Assessment ever undertaken in South Africa, (including St Lucia and Saldanha Steel). The cooperation between Thesen & Co. and the Thesen Islands Development Company with all the authorities was evident."
She ended by saying that Thesen Island has "evolved into a symbol of sound public participation, the successful management of environmental concerns, and a fresh and meaningful thrust for the socio-economic sustainability of Knysna and the South Cape Coast."
Mayor Alan Kock said that the Council had looked at all aspects of the planned redevelopment. Recognizing the need for environmental sensitivity, the Council had ensured that strict controls were imposed to ensure that the environment would be safe guarded before deciding to approve and support the project.
The Knysna Choral Choir, who the Thesen Islands Development Company have sponsored for some time, performed a number of foot tapping traditional songs to the enthusiastic response of the audience. Led by Graham Power, a number of the professional team as well as owners pledged donations totaling more than R20 000 to the choir.
With the construction of the first phase of the R800 million project having been underway since June, the guests enjoyed "Island Safaris" to view the progress achieved. Guests were dropped off at "lookouts" where construction and environmental experts were on hand to talk about the project. Already 3.4 kilometres of waterway frontage have been constructed. Guests expressed amazement at the size and scale of the waterways and at how much had already been done. Graham Power announced that construction was 2 to 3 weeks ahead of schedule.
The first phase of the development, which consists of 150 single residential stands, is scheduled for completion in July 2001. Virtually all the stands in the first phase have water frontage. With over 120 stands sold, sections of the second phase have now been released. Included is "North Beach", a select group of North facing stands all with a private jetty and beach, smaller "Tidewater" stands set next to the wetlands and "Edgewater" stands on the banks of the Waterway. The prices of these stands start at R385,000.

